unit1greatscientists必修5内容摘要:

re ill or died and where they got their water Mark information on a map to find out where people died or did not died if necessary a conclusion results Analyse the water to see if that is the cause of the illness Find other evidence to make sure the conclusion The water is to blame. The source of all drinking water should be examined. Read the passage again and finish Ex. 1(Page 3). (in 8 minutes) John Snow Defeats “King Cholera” Scientific Report by John Snow The problem The cause Idea 1: Idea 2: The method Nobody knew the cause of the serious disease of cholera a strange cloud of gas found its victims people absorbed the disease with meals Collect information from the cholera outbreak to prove wh。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。