20xx牛津上海版一起六上unit7rulesroundusppt课件2内容摘要:
ve rules? Brainstorm Look and learn We must not walk on the grass. We must not eat or drink. We must not leave rubbish. We must keep quiet. Match and say keep quiet leave rubbish sing loudly at night pick the flowers draw on our desks eat or drink listen to the teachers wait for the green man walk on the grass in the library in the classroom on the road。20xx牛津上海版一起六上unit7rulesroundusppt课件2
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。