20xx人教版高中英语必修五unit3lifeinthefuture7内容摘要:
tion Air: could improved in cities Nursery。 schools。 university Flats。 houses。 concrete。 wood Post office。 Inter Transport Work No longer by air because of environmental pollution。 bicycles and horses will make a eback. At home using advanced, interactive puters。 meetings can be conducted on the puter and people will see each other In One Thousand Years’ Time In One Thousand Years’ Time One。20xx人教版高中英语必修五unit3lifeinthefuture7
相关推荐
er gets ahead of all the other newspapers. The scoop tells about a famous film star, who has done something wrong but has been lying. 2. What is the scoop about? many people read his article before
nally, my thanks go to my tutor, who has offered a lot of suggestions and ments on my paper and ___________ (polish) every page of my draft. 解析: 句意:最后 , 我要感谢我的导师 , 他给我的论文提供了很多建议和评论 , 并且对我初稿的每一页都做了修改。
ohn perform on Anne? Why did he use tea towels ? Nobody could put their hands on any bandage. He used some tea towels and tape to treat the most severe injuries to Anne’s hands. He slowed the
remain: 1).vi. 剩下;留下; 2). Linkv. continue to be 继续保持,仍然 Much work remained to be done. I’ll remain to see the end of the match. The door remained closed. It remained raining. On special occasions on
in 10 days? John Snow Cholera outbreak hit London. 500 4. Why is there no death at No. 20 and 21 Broad Street as well as at No. 8 and 9 Cambridge Street? These families had not drunk the water from
Who used peas to show how physical characteristics are passed from parents to their children? Gregor Mendel It’s used in the treatment of some diseases, especially cancer. radium What’s this? 5. Who