高一unit4unforgetableexperiences(nx)内容摘要:
wonder • was Jeff looking for the chimney? • happened to them finally? It is the strongest part of the text. They were safe. Divide the text according to the change of the place. • First part In the garden from “ Flora heard” to “ Run” The second part The way to the house From “ the next moment” to “ but Jeff had opened the door. The last part Inside the house • From “ the next moment” to the end Exercise 1 a loud noise 2. There behind her 3. It a wall of water quickly advancing to her Flora’s Jeff and Flora Before 引导状语从句 ‘在 … 之前’ or ‘还没来得及’ • It was dark before she realized it . Someone called me at night, but he hung up _______ I could answer the phone. A. as B. until C. before D. since Sweep vt./ vi • Vt. 扫。 清扫。 冲光 sweep the floor of the room The wind swept the leaves away. vi. 掠过。 刮过 A storm swept over the country. She is sweeping with a bloom. must/can’t+ have +过去分词 : 表示对 已 发生的事情进行肯定 /否定 猜测 I didn’t hear the _____asleep. be have been C. Should be D. should have been B Jack ____ yet,otherwise he could have called me. ha。高一unit4unforgetableexperiences(nx)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。