牛津译林版高中英语选修八unit2theuniversallanguageproject课件内容摘要:

f 1955. “Rock Around the Clock” caused rock music to _____________________, separate style, and made it popular around the world. band Rock Around the Clock be recognized as its own Rock amp。 roll • Big Joe Turner was a ______ American singer. He released his 1st R amp。 R song called ________________ in 1954. black Shake, Rattle amp。 Roll • Who discovered Elvis Presley? • A music promoter from Memphis, Tennessee. • Out of what purpose? • Because of the prejudice and racial discrimination of the time • What did Elvis。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。