牛津译林版英语高一下册module3unit3backtothepast之五内容摘要:

1648 Where is it? On the bank of the River ‘Yamuna’ For whom and why was it built? For his wife and as a monument of eternal love Why was it appear to be ‘hanging’ in the air? Because the garden was built on the roofs of a building. Why was it built? To cheer up his wife ,who was said。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。