牛津译林版英语高一上册module1unit3lookinggood,feelinggood之四内容摘要:

The building is made of white marble(大理石) . A beautiful garden surrounds(环绕) the Taj Mahal. In front of the main entrance to the building there is Taj Mahal in the reflection from the water. King Nebuchadnezzar Ⅱ of Babylon(605562 BC) built the Hanging Gardens to cheer up his wife who missed the flowers and trees of her homeland. The garden got its name because it was built entirely on the roof of the building ,which was surround。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。