外研版高中英语选修9module3theqintombandtheterracottawarriors之四内容摘要:

? Do you like the house that they are painting now? (11) 关系代词 that 在定语从句中用于最高级 形容词和 all, everything, anything , something nothing only,the few ,the one 等的后面 : This is the best book that I have ever read. Is there anything that you want to say? ( 12) that 在定语从句中作宾语可以省去: Nothing he takes about is interesting . (13)the same +名词 +that This is the same book that I bought last week. Is this the same lady that you saw with him at the restaurant ? Of ( 1)表示所有关系: This is the estate of Lord Johnson. ( 2)表示部分关系 several of the members three of them ( 3)表示空间或时间的距离: The restaur。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。