外研版高中英语选修8module5theconquestoftheuniverse之一内容摘要:

e. the importance its philosophy the story The structure of the passage 1. The films were made in random order, and move backwards and forwards through two hundred years. 2. Luke escapes the latter’s grasp, as well as the Emperor’s attempt to turn him to the Dark Side. his father is actually Darth Vader himself. he achieves glory by turning his father back to the Light Side. Reading for further understanding Tip two: guess the meaning of some words from the context. Tip three: find answers from the sentence b fore it and after it. Wars reflects abstract concepts in folk stories, such as an ability to foresee the future and the impossibility of controlling one’s destiny. For example, Anakin. Luke a hero of a wuxia film. Knowing what is going to happen and being unable to do a。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。