外研版高中英语选修7module6theworld’sculturalheritagereadingandvocabulary课件内容摘要:

mber 1987 Part 2 Beijing Man Heritage Site in Danger Para 1 Is there the earliest evidence of the use of fire by humans? Para 2 1) two natural causes of the destruction of the caves rain and exposure to the air 2) the origin of pollution that is affecting the caves nearby cement factories two demands from UNESCO the site should be closed and repaired Para 3 1)They have remended that the site be closed and repaired UNESCO。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。