外研版高中英语必修5module6animalsindanger之三内容摘要:
_______ Tibetan antelope. He asked them to __________ their guns. But the poachers had an ___________ there were more of them. As a result, Jiesang was shot and killed. He had ____________ to save the Tibetan antelope. On freezing poachers endangered put down advantage given his life Paragraph 2 What was the reason that the number of the antelopes on the QinghaiTibetan Plateau had fallen ? Its wool is the most expensive in the world. It is soft, light and warm the ideal coat for an animal. For poachers the profits can be huge. Paragraph 3 1. The poachers shoot whole herds of antelopes at a time, _________________________________________________(只留下那些毛不那么值钱的幼崽。 ) 2. The animals _________________________(就地剥皮 ) and the wool taken to India, where it is made into the shawls. 3. The business is _______________(非法 ) and there has a ____________(禁令 ) on the trade . 4. ________________(在二十世纪九十年代 )the shawls _________________(盛行 ) among rich people. leaving only the babies,whose wool is not worth so much. are skinned on the spot illegal ban In the 1990s came into fashion Paragraph 4 What did the Chinese government do to protect。外研版高中英语必修5module6animalsindanger之三
相关推荐
_________________________ • 8. That way,you don’t damage your confidence. • 它涉及了说和听。 • _________________ 提前做写准备 ,会对你有帮助的 . 提前做计划 聊天是很重要的 ,它使你为更多的严肃谈话做准备 . 有备无患 !准备些低风险的开场白 . have/make/get……..ready
osely connected with bad eating habits and a________of exercise. • A. limit B. lack • C. need D. demand • 【 解析 】 句意为:健康问题与不良的饮食习惯和缺乏锻炼息息相关。 根据句意,所表达的应是缺乏的意思。 limit限制;need需要; demand需求。 • 【 答案 】 B • 2.
wee is interested in the job. b) The answers are too short. c) The answers are impolite. 1 (and possibly 3) Activity 3 Listen to the whole of the first conversation and answer the questions. 1. Do
al work Read the passage on Page 51 and answer the question: What is the present living situation of the Siberian tiger? Fast reading: Read the text as fast as possible and s
6 Why was he almost late for the 1,500 metres race? With his head. Just before the end of the race, he had terrible pain and had to pull out of the race. His bus_________ in a traffic jam. got stuck
the moment is________on the problem of industrial relations. • A. called B. paid • C. focused D. put • 【 解析 】 考查词义辨析。 根据句意“ 目前公众的注意力集中在工业关系的问题上 ” ,可知正确答案。 • 【 答案 】 C • 6. (2020年福建卷 )—You are always