外研版高中英语必修5module5thegreatsportspersonality之四内容摘要:
_war on the United States, and war is what they got, ” Bush said. • A. attacked B. declared • C. fought D. offered • 【 解析 】 declare war on 战,为固定词组。 • 【 答案 】 B • 1. 站起身 • 2. 由某人决定 • 3. 每十秒钟 • 4. 比 „„ 有优势 • 5. 正在增加 • 6. 七分之六 • 7. 根据,依据 • 8. 拾起,捡起 • 9. 和 „„ 竞争 rise_to_one’s_feet be_up_to_sb. every_ten_seconds have_an_advantage_over on_the_increase six_out_of_seven according_to pick_up pete_with • on the increase正在增加 • (1)on the rise在增加 • on the decrease在减少 • (2)increase by+倍数或百分数,表示增加了 „„ 倍或百分之 „„ • increase to+具体的增长后的数字,表示增加到 „ • ① Crime in big cities is on the increase. • 大城市里的犯罪率呈增长趋势。 • ② The number of traffic accidents seems to be on the increase. • 交通事故的数量似乎正在增加。 • ③ The number of smokers in our country is on the rise. • 我国烟民数量在增长。 • ④ Smoking is harmful to people’ s health,so the number of smokers is on the decrease.吸烟对身体有害,因此烟民的数量在减少。 • ⑤ The number of the students in our class increased by ten this 数目增加了十人。 • rise to one’ s feet站起来 • struggle to one’ s feet挣扎着站起来 • stand on one’ s own feet独立自主,自立 • get to one’ s feet跳 /站起来 • jump to one’ s feet跳起来 • bring someone to one’ s feet扶起 „ • ① The headmaster rose to his feet to wele me. • 校长站起身来欢迎我。 • ② He rose to his feet and left the room without a word. • 他站起身一句话也没说就离开了那个房间。 • ③ He tried to struggle to his feet, but in vain. • 他试图挣扎着站起来,但是徒劳。 • ④ Now that you have been an adult, you must learn to stand on your own 已经是一个成人了,你必须学会自立。 • ⑤ Hearing the news, he jumped to his feet with joy. • 听到这个消息,他高兴地跳了起来。 • 1. The new law has e into effect,and________number of wild animals here is on________increase now. • A. the; the B. a; the • C. the; / D. a; / • 【 解析 】 由谓语动词 is可知主语是 the number of...; on the increase是固定短语,意为 “ 在增加 ”。 • 【 答案 】 A • 2. The moment he heard his name was called, he________to his feet. • A. got B. stood • C. got up D. stood up • 【 解析 】 由句意可知,此处指站起来, get to one’ s feet= rise to one’ s feet,故选 A。 • 【 答案 】 A • 3. After she heard what the man said,she________angrily and left. • A. rose to her feet B. rose from • C. rose to her foot D. struggled her feet • 【 答案 】 A • 4. After he was knocked down by a car which escaped immediately, he________to his feet and called 120 and the police station. • A. stood B. struggled • C. ran D. rose • 【 解析 】 struggle to one’ s feet是固定词组,意为 “ 挣扎着站起来 ”。 • 【 答案 】 B • 1. But________ ________this sense of failure________made him determined to succeed in his new life. • 但就是这种失败感使他决心在新的生活中取得成功。 •。外研版高中英语必修5module5thegreatsportspersonality之四
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。