外研版高中英语必修2module7revisionppt语法课件1内容摘要:

most important questions they had to consider was________of public health. • A. what B. this • C. that D. which • 【 解析 】 句意为:他们必须考虑的最重要的问题之一就是公众健康问题。 此题考查的是 that的指代用法, that在此等于 the question。 • 【 答案 】 C • 4. (2020年全国卷 Ⅱ )Charles was alone at home, with________looking after him. • A. someone B. anyone • C. not one D. no one • 【 解析 】 句意为:查尔斯独自一人在家,没有人照顾他。 no one= nobody没有人。 • 【 答案 】 D • 5. (2020年全国卷 Ⅱ )The CDs are on sale。 Buy one and you get________pletely free. • A. other B. others • C. one D. ones • 【 解析 】 句意为: CD减价销售了。 买一赠一。 此处 one用来替代 a CD。 • 【 答案 】 C • 6. (2020年湖南卷 )Most Americans would prefer to keep their problems________themselves and solve their problems________themselves. • A. to; by B. by; to • C. for; to D. in; on • 【 解析 】 句意为:大部分美国人愿意有问题自己担着而且靠自己来解决。 have/keep...to oneself—not share with anyone else独享, by后接反身代词则表示 “ 由自己来做 ”。 • 【 答案 】 A • 7. (2020年上海卷 )—Wow。 You’ ve got so many clothes. • —But________of them are in fashion now. • A. all B. both • C. neither D. none • 【 解析 】 句意为: ——哇。 你衣服真多啊。 ——但是现在没一件跟得上潮流。 根据句意, but引导转折句,空格处应用否定词 none。 • 【 答案 】 D • 8. (2020年重庆卷 )Over the past 20 years,the Inter has helped change our world in________way or another for the better. • A. any B. one • C. every D. either • 【 解析 】 句意为:在过去的 20年里,因特网以某些方式改变了我们的世界。 在本题中, one way or another是固定搭配,意思是 “ by some means, methods, etc.”。 • 【 答案 】 B • 9. (2020年四川卷 )I like this house with a beautiful garden in front, but I don’ t have enough money to buy________. • A. one B. it • C. this D. that • 【 解析 】 句意为:我喜欢这套带漂亮前院的房子,但是我没有足够的钱去买它。 在代词中, one用于泛指某类中的一个; it用于特指,指前面提及的单数个体; this用于指已经提到或已知的人、物、主意等;that用于名词或代词前, “ 那个 ” ,指人或事物,尤指在空间或时间上较远的物等。 • 【 答案 】 B • 10. (2020年陕西卷 )Jane was asked a lot of questions, but she didn’ t answer________of them. • A. other B. any • C. none D. some • 【 解析 】 句意为: Jane被问了很多问题,但她一个都没回答出来。 首先排除 A项,因。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。