外研版高中英语必修2module6filmsandtvprogrammes之二内容摘要:
to one’ s surprise/joy...这类表达加强程度的方法有两种。 much to one’ s surprise/joy...或 to one’ s great surprise/joy...。 • ④ Much to my surprise/To my great surprise, he came out first. • 令我大为吃惊的是,他居然得了第一名。 • ⑤ To their disappointment, they have to go on working during National Day. • 让他们失望的是,在国庆节期间他们还要继续上班。 • ⑥ To everyone’ s sorrow, Lincoln was shot to death after the war. • 让所有人难过的是,林肯在战后被枪杀致死。 • every two days每两天 • (1)every+基数词+复数名词 • The American people elect a president every four years. • 美国人民每四年选举一任总统。 • Take the medicine every six 6小时吃一次药。 • (2)every+序数词+单数名词 • He es to see his uncle every third week. • 他每三个星期来看望他叔叔一次。 • (3)every+ other+单数名词,每隔一 „„ • Write on every other。 • We have English lessons every other day;that is on Monday, Wednesday and Friday. • 我们隔一天上英语课,就是在星期一,星期三和星期五。 • (4)every+ few+复数名词,每隔几 „„ • Trees should be planted every few metres. • 树应每间隔几米种一棵。 • 1. Great changes________in the city,and a lot of factories________. • A. have been taken place; have been set up • B. have taken place; have been set up • C. have taken place; have set up • D. were taken place; were set up • 【 答案 】 B • 2. —How long have they________with each other? • —About half a her at first sight. • A. been in love; fell in love • B. fallen in love; fell in love • C. been in love; was in love • D. fallen in love; was in love • 【 解析 】 be in love with表状态,可以与一段时间连用,故上一句用 been in love;fall in love with是非延续性动词短语,强调动作,故后一空用 fell in love。 • 【 答案 】 A • 3. The dictionary is being printed and it will soon________. • A. turn out B. e out • C. start out D. go out • 【 解析 】 句意为:这本词典正在印刷,不久将出版。 turn out结果,证明是;e out 出版; start out 出发,动身; go out 外出,熄灭。 • 【 答案 】 B • 4. He went back home________and never failed to do that. • A. every another day B. every two day • C. every other day D. every second days • 【 解析 】 每两天表达形式有三种,即 every two days, every other day, every second day。 • 【 答案 】 C • 1. The action takes place on Peking rooftops, and in places ________ ________ away ________ the deserts of western China. • 打斗发生在北京的屋顶之上和中国西部遥远的沙漠之中。 • 【 答案 】 as far; as • 2. Unusually, ________ ________ the female characters ________ interest us most.不同寻常的是,正是女主角吸引我们。 • 【 答案 】 it is; that • 3. ________, ________ ________ ________, Xiulian is the character we care about most. • 我们最关注秀莲这个角色,她勇敢、善良、坚强。 • 【 答案 】 Brave; good and strong • 4. But ________ ________ ________ ________, ________he, more than anyone else in the history of films, understands the meaning of the word “ entertainment.” 但是绝大多数人认为:他比电影史上任何一个人更懂得 “ 娱乐 ” 一词的意义。 • 【 答案 】 it is generally agreed; that • Brave, good and strong, Xiulian is the character we car。外研版高中英语必修2module6filmsandtvprogrammes之二
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。