外研版高中英语必修2module1ourbodyandhealthyhabits之三内容摘要:

【 解析 】 在事故中受伤用 injure。 damage“ 损害 ” 一般不用于人体的部位,wound一般指在战争、暴力中受伤, hurt作及物动词可以指肉体上的伤害,也可指精神上的伤害,但当做不及物动词时,意为“ 疼痛 ” ,故选 B项。 • 【 答案 】 B • 7. Everything has been back to________after last week’ s strike. • A. normal B. mon • C. ordinary D. level • 【 解析 】 be back to normal 恢复正常。 • 【 答案 】 A • 8. Our parents always get a little bit________if we don’ t manage to arrive when we say we will. • A. eager B. anxious • C. patient D. earnest • 【 解析 】 句意为:当我们没有在我们说的时间到达时,我们的父母总是会有点担心。 eager渴望的,热情的, anxious担心的,渴望的,焦虑的, patient耐心的,earnest诚实的,真诚的。 • 【 答案 】 B • 1. 与 „„ 有联系 • 2. 锻炼 • 3. 对 „„ 着迷 • 4. 以 „„ 开始 • 5. 将 „„ 投入 „„ • 6. 朝 „„ 前进 be_connected_with take_exercise be_crazy_about begin_with put...into... head_towards/for • 7. 至少 • 8. 发烧 • 9. 拾起;接 (人 );取 (物 );接收 • 10. 躺下 • 11. 轮流 • 12. 休假 at_least have_a_temperature/fever pick_up lie_down take_turns be_off_work • be connected with与 „„ 有联系 • 表示 “ 与 „„ 有联系 ” 的常见短语还有: • have (a) connection with • be related to • have something to do with • ① He isn’ t connected with the 与这起犯罪毫无牵连。 • ② We have been connected with the pany since 2020. • 自 2020年以来我们一直跟这家公司有贸易往来。 • ③ Does he have any connection with the accident? • 他与这次事故有关联吗。 • 表示两者有形的连接时, to和with都可以和 connect连用;指 “ 与 „„ 有联系;与 „„ 有关 ” 时,后接 with而不接to。 • be crazy about迷恋;热衷于;醉心于 • drive • go crazy发疯 • be crazy for渴望 „„ • be crazy with因 „„ 而发狂 • like crazy发疯似地;以惊人的气势 • ① He is crazy about 了迷。 • ② He is crazy about classical 古典音乐十分痴迷。 • ③ It is crazy of you to buy the car at such a high price. • 居然花那么高的价钱去买这辆车,你真是疯了。 • ④ We are going to have to work like crazy to get this finished on 成工作我们得拼命干了。 • ⑤ Turn that music down; it’ s driving me crazy! • 把音乐调小声点儿,它吵得我心烦。 • 1. —I am ________about playing puter often play for 24 hours without stop. • —It’ s bad for your ’ d better give up this bad habit. • A. surprising; healthy B. interesting;health • C. crazy; healthy D. crazy;health • 【 答案 】 D • 2. Tom has been________about football since he was very young and plays it every day. • A. eager B. crazy • C. curious D. interested • 【 答案 】 B • 3. The police have collected some information________the murder. • A. connected by B. connected with • C. connecting with D. was connected with • 【 答案 】 B • 1. When Zhou Kai’ s mother ________ him ________ towards the front door ________ a jacket ________, she eyed him anxiously. • 周凯的妈妈看到他没有穿夹克衫就往前门走去时,她担心地盯着他。 • 【 答案 】 saw; heading; without; on • 2. But ________ ________I was ________ ________ ________play football in the ,竟然在雨中踢足球。 • 【 答案 】 that’ s because; stupid enough to • 3. ________ ________ ________ ________ you’ ll get/bee really 行体育锻炼,你就会真正身体健康。 • 【 答案 】 Take more exercise and • But that’ s because I was stupid enough to play football in the 为我太傻了,竟然在雨中踢足球。 • (1)it’ s/that’ s because+从句,那是因为 „„ (表原因 )because引导表语从句。 • 相似句式: that’ s why...那是干 „„ 的原因 (表结果 ) • (2)主语+ be+ adj.+ enough+ to do sth.足够 „„ 能干 „„ • 主语+ be+ not+ adj.+ enough+ to do sth. • 不够 „„ 不能干 „„ • (3)主语+ can’ t/hardly/never+ be+ adj.+ enough • 怎么做 „„ 也不过分 (= can’ t be too+adj. ) • ① That was because World War Ⅱ broke out. • 那是因为二战爆发了。 • ② That is why he was absent from school. • 那就是他没来上学的原因。 • ③ He is ’ s why he isn’ t here.。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。