北师大版英语高一下册module4unit11themediappt说课课件内容摘要:

: Ⅲ . Teaching methodology • On teaching methods: • “Tell me, I will fet. Teach me, I will remember. Involve me, I will learn.” • Franklin a series of learnercentered methods On teaching methods: • 1. Taskbased approach involves the students with different tasks。 • 2. Constructivism emphasizes the students’ own generative learning process • 3. Howard Gardner’s theory of Multiple Intelligences intends to develop the students’ allround potentials. On learning methods: • learner’s learning activities should center on their cooperation and team work. their learning activities outside the classroom 2. benefit their lifelong learning. On teaching aids: 1. The blackboard 2. A projector 3. Some slides Ⅳ . Teaching Procedures • Part 1: Reading (14 mins) • Before reading • While reading • After reading • Part 2: Writing (30 mins) • Before writing • While writing • After writing • Part 3: Assignment (1 min) pretask task cycle aftertask Teachi。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。