人教版高中英语必修三unit4astronomythescienceofthestarsreading课件内容摘要:

ife developed in water next? green plants began to grow on land insects appeared about the life on land? amphibians on land and in the water forests 4. What life developed next on land? reptiles appeared dinosaur developed life developed after forests appeared? mammals on land life developed after dinosaurs? small clever animals 7. What life developed after mammals? • What are they doing on the earth? Because they are putting too much carbon dioxide into the atmosphere, which prevents heat from escaping from the earth into space. The earth may bee too hot to live on . 1. Insects and amphibians appeared. 3. The earth became a solid ball. 5. Reptiles app。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。