某家用电器公司2101顾客特殊要求控制程序(编辑修改稿)内容摘要:
调项目组有关人员或 归口 部门指定联系人必须及时与顾客沟通、联络,识别和明确顾客的特殊要求,并由横向协调项目 经理 登记在《顾客特殊要求一览表》上。 本 资料来自 When it is required to conduct advanced product quality planning and establish control plans under the occasions of new customers, new products, product modification or production condition change, AICQ relative persons of project team or functional departments shall appoint a liaison person to maintain timely munication with the customers, identify and define the customer special requirements, which must be recorded in the List of Customer Special Requirements by the project manager. 技术工程部 负责审核《顾客特殊要求一览表》。 The Engineering Department is responsible to review the List of Customer Special。某家用电器公司2101顾客特殊要求控制程序(编辑修改稿)
相关推荐
he department using the forms shall inspect the quality records every month and determine if they are in pliance with the facts. Each functional department is responsible to collect and trim the
许偏差范围内,则视试验机电流表为合格,反之,则视为不合格。 35 电压表校验: 351 供给试验机额定电压,用三用表之两测试棒分别接触试验机电压表两接线端,即 352 可从三用表中读出此时电压的实际值。 上海正峰工业有限公司 标准书名称 电机特性检验台校正标准 编号 SAK123 页次 2/2 353 将三用表所示电压值与试验机所示电压值相比较,若二者所示值于允许偏差范围 内
生 产边采购的现象,严重影响交货期。 新产品的定位不清,没有对新产品的价格、质量、质材要求、工艺要求明确规定,这样造成生产采购的尺度把握不准,一致于不能准确采购。 问题六:模型问题。 (估计在晚交货总数中占 5%) 模型不足,坏的多,并且需要应付不同的质材,如不锈钢、球墨、铸铁等 模型的设计有问题,部分造成铸件废品率高,到厂检验后退回大部分铸件,震荡试验和生产中有出现较多废品,严重影响交货期。
. Approval must be obtained from the customer in case the methods other than the standards are adopted. 所有试验规程、操作规程以及所需技术规范等均须在测试现场易于得到,供试验人员使用。 All the test procedures, operation regulations and
The operation instructions shall be formulated under the anization of the Equipment Section of Manufacturing Department. The operator shall observe the operation instructions and keep the equipment
stics as indicated in customer drawings, and the roles, effects and control requirements of each operational procedure during product creation, the Manufacturing Department shall preliminarily