九年级英语现在进行时复习内容摘要:

riding a bike. Write, write, writing a letter, writing a letter. Swim, swim, swimming in the lake, swimming in the lake. Run, run, running on the grass, running on the grass. Tom play football. is ing Lucy is read a book. ing 主语 + be (am/is/are) +动词 ing Look, I read a book am ing You run are ning. now. They watch TV are ing Look! The twins think are ing. now. 现在进行时态 表示 正在进行 的动作或事情。 now, look, listen… 其构成形式是 主语 + be (am/is/are) +动词 ing What is he doing?。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。