外研版英语七下module9storytimeppt课件内容摘要:

ouse Period 2 Reading and Vocabulary Step1 Warming up amp。 Revision 1. Can you read these? knocked picked walked pushed liked finished stopped noticed answered entered hurried lived counted decided 2. Can you retell the story of Goldilocks? 设计理念:复习环节要突出实效,一般刚开始上课学生注意力更集中,有利于对前面的知识及时有效的复习。 Step2 Pre- read 1. Guess:Whose house was it? 2. Activity6 on page57, read and answer. 3. Work in pairs. Say what happened next in Goldilocks and Three Bears.(Activity1) 4. Learn some new words: try—tried destroy—destroyed cry—cried return—returned point—pointed jump—jumped 设计理念:阅读故事前应该先进行热身活动,有 利于对故事先有一个词汇上的准备。 Step3 Read 1. What can you see in the picture ? 设计理念 :借助对图片的认识,对故事有一个大致的了解。 2. Read the story and number the pictures in the correct order. 设计理念 :改变以往快速阅读后回答一二个简单的问题的形式,重新排列图片使学生对故事有进一步的认识。 2 4 5 3 and check the true sentences. 1) Goldilocks didn’t like the smallest chair. ( ) 2) Goldilocks didn’t like the smallest bed. ( ) 3) Baby Bear didn’t look in the bedroom. ( ) 4) Baby Bear didn’t notice the little girl in his bed at first. ( ) 5) Goldilocks didn’t notice the three Bears at first. ( ) 6) Goldilocks didn’t like the three Bears. ( ) √ √ 设计理念 : 精读故事之后,对故事的细节需要有一定的认识,可以自己另外设计一些选择题目。 Step4 Listen and repeat First, Goldilocks wanted to sit down because she was tired. The two big chairs were unfortable. She didn’t like them, so she tried the smallest chair. It was nice, but Goldilocks was very heavy and she destroyed it. She was unhappy and tired. She walked into the bedroom. There were three beds. She didn’t like the two big beds. The smallest bed was very fortable. Very soon she was asleep in it. The three Bears returned. They looked at the bowls and the chairs. Baby Bear cried, “There’s nothing in my bowl and my chair is in pieces!’’ He was very unhappy! Next, the Bears looked in their bedroom. They didn’t notice Goldilocks at first. Then Baby Bear pointed at the little girl in his bed, and cried,“Look! There’s the naughty girl!” Final。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。