外研版八上unit2thewhiterabbitwaslookingatitswatchppt课件内容摘要:

as her sister doing ? 4).Why didn39。 t Alice like sister39。 s book ? 5).What was Alice thinking of doing ? 6).What happened next ? 7).What did the rabbit say ? 8).What did the rabbit do with its watch ? 9).Why did Alice get up ? 10).Where did the rabbit go ? 11).What did Alice do ? 12).How was she going to get out again ? Tired. By the river. Reading a book. Because it had no pictures or conversations. Making a daisy chain. she saw a white rabbit run by her. “oh dear !Oh dear !I’ll be late.” It took it out of its pocket and looked at it. To run after the rabbit. It went down a rabbit hole under the hedge. She went down after the White Rabbit. She didn’t think about it. 一般过去时和过去进行时的区别: 相同点 :两者都表示过去发生的动作。 不同点 : 一般过去时 表示过去一个 完成的动作。 过去进行时 表示 过去正在进行 的动作, 可能没有完成。 . He read a book last night. 昨天晚上他读了一本书。 ( 读完了 ) He was reading。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。