外研版九上unit2there39snoshoutingandnorunningppt课件内容摘要:

② 这里的气候跟加拿大的气候不相同。 The climate here __________________ that in Canada. diferences betweenand is different from 2. work out 算出、解决、想出 work it \ them out ① 如果她解决了这个问题,就可以离开了。 She can go if she ________ this problem. works out 3. try out 试验 ① It’s a good idea. Do you want to __? A. try it out B. try it on C. try out it 4. fill A with B 用 A把 B装满 be filled with 被装满 ② 当他是小孩时,他尝试 了 很多新想法。 He ________ many new ideas when he was a child. tried out ① The child __ the bottle ___ water. A.。 to B. fill。 with C. filled。 with ② The basket was __ with eggs. A. fill B. filled C. filling ③ 这些袋子里满是沙。 These bags ______________ sand.。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。