外研版中考英语第3讲七年级下册modules1-4课件内容摘要:

„„ );either...or...(要么 „„ 要么 „„ );连接并列的主语时 , 谓语采取就近原则。 【 注意 】 both...and...的谓语要用复数。 【 活学活用 】 (8)—Where are you going to stay when you get to Shanghai? — I may live __B__ in a hotel ________ in a friend39。 s house.(2020, 呼和浩特 ) A. both; and B. either; or C. neither; nor D. not only; but also (9)李明不仅聪明而且勤奋。 (2020, 盐城 ) Li_Ming_is_not_only_clever_but_also_hardworking. (10)—Tim, how do your parents like pop music? — __B__ my dad ________ my mom likes both prefer classical music.(2020, 福州 ) A. Either; or B. Neither; nor C. Not only; but also D. Both; and (11)我感到惊讶 , 我和大卫都未受邀参加这个晚会。 (2020, 黄石 ) I felt surprised that neither David nor I was invited to take part in the evening. 1. Here is/are...这 (些 )是 „„ 【 典例在线 】 Here are some。 Here are some。 【 拓展精析 】 Here is/are...是一个倒装句型 , is/are由后面的主语决定。 在这个倒装句型中 , 主语一定要是名词 , 主语是代词时 , 则用部分倒装。 在 “ Here be”句型中 , be动词一般用 is/are, 不用其他的形式。 【 活学活用 】 (1)Here __A__ your letter from your parents. A. is B. are C. was D. were (2)—May I have a look at that book? — __B__. A. Here are you B. Here you are C. There are you D. There you are 2. I39。 m going to check my 电子邮件。 【 典例在线 】 I39。 m going to lie on the beach for a day. 我打算在沙滩上躺一天。 In the afternoon, I39。 m going to have a piano lesson. 下午 , 我将去上钢琴课。 【 拓展精析 】 be going to do结构表示 “ 打算 , 计划要做某事 ” , 用于表达将来的动作 , 后跟动词原形。 be going to do结构的构成如下: 肯定句 主语+ be going to+动词原形 „„ 否定句 在 be之后加 not 一般疑问句 把 be提前 特殊疑问句 特殊疑问词+ be+主语+ going to+动词原形„„ 【 活学活用 】 (3)Hurry up。 The sky is covered with black 39。 m afraid it __B__. (2020, 丽水 ) A. rains B. is going to rain C. rained D. was raining (4)There __D__ a sports meeting in our school next week.(2020, 南充 ) A. will have B. is going to have C. are going to be D. is going to be 3. There will be robots in people39。 s 有机器人。 【 典例在线 】 I think there will be less room to 方居住。 People will not use the paper。 【 拓展精析 】 一般将来时表示将来要发生的事情或对将来的预测。 其肯定结构为: will+动词原形。 否定式: will not= won39。 t。 一般疑问式则将 will提到句首。 there will be...是 there be句型的一般将来时 , 意为 “ 将有„„”。 表示有计划性进行的时候可用 be going to代替 will。 【 活学活用 】 (5)There __D__ a sports meet in our school next week.(2020, 铜仁 ) A. is B. will have C. are D. will be (6)Robots __A__ more heavy work for us in the future.(2020, 天津 ) A. will do B. did C. have done D. were doing 1. look for, find, find out 【 典例在线 】 My keys are have looked for them here and there, but I can39。 t find , 我到处找 , 但我找不到。 If you burned yourself by accident, you should first find out how bad it , 你应该先查明伤势有多严重。 【 拓展精析 】 find动词 , 意为 “ 找到 ” , 强调寻找的结果。 look for意为 “ 寻找 ” , 强调寻找的过程。 find out意为 “ 查明 (事实或事情的真相 )”。 【 活学活用 】 (1)—What are you doing? — I39。 m looking_for my。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。