外研版中考英语第13讲八年级下册modules3-4课件内容摘要:

D. Were there (3)There __B__ great changes in such kind of PDAs(掌上电脑 ) in the last few years.(2020, 平凉 ) A. was been B. have been C. has had D. have had 2. Since 1989 Project Hope has built schools all over China.自从 1989年以来 , 希望工程已经在全国建了学校。 【 典例在线 】 Since 2020, China has sent six spaceships into 2020年以来 , 中国已发送 6艘宇宙飞船进入太空。 The film has been on for an。 It39。 s ten years since he became a 始到现在已有 10年了。 【 拓展精析 】 现在完成时: for后接表示一段时间的词或短语 , 如 for 5 years。 since后接表示过去某一时间的词或短语 (如 since last month), 也可接表示过去的句子 (如 since he came to China)。 即: for+时间段; since+时间点。 当与 how long, for, since连用时 , 句中的动词要用延续性动词;短暂性动词须换成延续性动词或表状态的形容词或介词短语。 如: e→ be in; leave→ be away; open→ be open; close→ be closed; begin/start→ be on; borrow→ keep; buy→ have等。 it is+时间段+ since+从句 (一般过去时 ), 意为 “ 自从„„ 到现在已有多长时间了 ”。 【 活学活用 】 (4)—I wonder when you __C__ the new watch.(2020, 随州 ) —Well, I ________ it for two weeks. A. have bought; have had B. bought; have bought C. bought; have had D. have bought; have bought (5)—When will A Bite of China Ⅱ begin tonight? —It __D__ for ten minutes.(2020, 扬州 ) A. will begin B. has begun C. will be on D. has been on (6)She __B__ her home town since she was 18 years told me she would return soon.(2020, 凉山 ) A. has left B. has been away from C. left D. went away 1. have been to, have gone to, have been at/in 【 典例在线 】 He has been to。 He has gone to。 He has been in Beijing for ten 了。 【 拓展精析 】 have been to, have gone to, have been at/in都用于现在完成时 , 表示过去的动作对现在造成的影响或结果。 易混辨析: have been to, have gone to, have been in/at have gone to 意为 “ 去了某地 ” ,表示某人不在说话的地方 , 还没有回来。 have been to 意为 “ 去过某地 ” ,表示某人到过某地 ,现在已经回来了;常和 ever、 never和次数连用。 have been in/at 常与一段时间连用 ,意为 “ 来 /去 /到某地多长时间了 ”。 【 活学活用 】 (1)—Where is Mr. Wang。 (2020, 扬州 ) —He together with his students __A__ Zhuyuwan Park. A. has gone to B. have gone to C. has been to。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。