外研版三起英语五上m4u2教学设计内容摘要:

hand and answer “ It’s Daming’s” . If his answer is right , he can e to the front of the classroom and choose one of the things and ask Whose pen is this ? . Another one answers . If his answer is wrong . Another pupil instead . 2 Return the things 1) Put other things on the teacher’s desk . Like: sweater , cap , T—shirt 2) Tell the pupils: The teacher wants to return the things on the desk , but don’t know “ Whose it is” So needs the pupils’ help . 3) Take one of them , and ask “ Is this Sam’s T—shirt ?” the pupils judge and answer “Yes ,it’s his . / No , it isn’t his .” Last , the owner judge . 4) Ask the pupils to be a teacher , ask and answer and return the things . St。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。