外研版高中英语选修8module6thetangpoems2内容摘要:

r reading : Fill in the blanks Step 4. language st udy 1. It’s a time of expansion. ★ time 意为 “时期 , 时代 ”  in time of war /peace 在战时 /和平时期  at flowering time 在开花时节  The new president is spending a hard time. 那位新总统正在度过艰难时期。 2. The invention of printing about this time meant that knowledge could be recorded and shared as never before. ★ mean “意味着 ”,后接宾语从句或 ving[来源 :学科网 ] Missing the first bus means waiting for another hour. ★ mean “打算,企图 ”,后接动词不定式。 I’m sorry I didn’t mean to hurt you. 3. Soon Japan and Korea were anized on the Tang Mo。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。