外研版高中英语选修7module5ethniccultureintroduction素材内容摘要:
s Region in the east, Tibet Autonomous Region in the northwest, and the QinghaiTibet Plateau in the southwest. Outside China, Yunnan borders on Burma in the west。 Vietnam and Laos in the south. With a long borderline, is the main passageway connecting China with the Southeast Asian nations. In Yunnan, there are more than 6000 rivers which belong to 6 riversystems and 37 lakes with an area of over 1 square kilometer can be seen here, boasting a large number of plateau lakes. For example, the Dianchi Lake was called the bright pearl of Plateau. There are 700 hot springs as well, all of which attract lots of friends all over the world. According to our Chinese culture, a perfect place should consist of both the waterscape and the mountain. Yunnan’s mountains are also famous, includi ng the Yulong Xueshan Mountain in Lijiang, which was regarded as one of the key scenic spots at state level. The mountains and rivers i。外研版高中英语选修7module5ethniccultureintroduction素材
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。