北师大版高中英语必修五unit14careersword导学案11内容摘要:
with , on D. with, with ,not you,__in the I but he__been invited. ,have ,has ,has ,have me, , but I have to ________you with a question. need many things, but ______they need love. A. at all B. in all C. after all D. above all 5. 我 正忙着,不要打扰我。 __________________________________________________________。 __________________________________________________________ pany is only one of the b__________ of an international pany. is always d____________ and never feels tired. Step V 小结与反思 ____________________________________________________________________________________________________________________ Unit 14 Careers 导学案( 8) Lesson 4 Survival of the Fittest Tips: Life is not fair, get used to Gates 生活是不公平的,要去适应它。 比 尔 .盖茨 Learning aims: study of the ,10 the exercises related to collocations(组合) (verb +noun, verb + adverb, verb +adjective). (分类 )the words from the text that often go together. Learning important point: 固定词语,句型的记忆 Learning difficult point: 短语组合的运用 Learning guides: 英语单词最好 能根据 意群短语 进行记忆。 Learning processess: Step I 单词检测 A 级 1. ,安逸 ________3. 奴隶 ___________ ,惊惶 ,迅速发展的 ______________ ,判断力 _____________ ,操作 ____________ ,烦扰 ____________ Step II 词语互译 (在 9,10 段中 划出下列词组) B 级 1. the driving force ____________ left behind_______________ _______________________________ ,以防万一 _____________ sb. to do is no doubt that connected to_______________ 8. slave labour_____________ 9. rather than___________________ Step。北师大版高中英语必修五unit14careersword导学案11
相关推荐
o 7. A. delighted B. nervous C. disappointed D. angry 8. A. pointing B. looking C. smiling D. waving 9. A. whispered B. explained C. shouted D. nodded 10. A. empty B. stupid C. quiet D. blank 11. A.
trouble in doing sth. are on a school trip and the coach has an accident when a deer runs across the road. Be a on a school trip 在旅行中 eg. we are going on a school trip 翻译: Run across 偶然遇到 I ran
e pany retirement B. she enjoys being a full time housewife C. she has learnt many new skills and prepared to set up her own export pany after getting laid off. D. she can have more free time to
to Dr. Laurence Lyons of Future Work, women will be envied because they have an advantage in this area. 【单词解析】 envy n/ vt. 妒忌。 羡慕 out of envy 处于妒忌 envy sb sth 羡慕某人某事 【及时反馈】 我羡慕你的好运。
C 级 Discovery 1: Look at the dialogue and plete the gaps. •I think my French tutor ______ know … • They _____ be so frightened! • They _____ have been separated from… • Or they _____ have gone
understanding between the two countries. 他的来访增进了两国间更好的理解。 Drunk driving contributed to her death. 酒驾是她死亡的原因。 Chen Guangbiao, a Chinese businessman in Jiangsu Province, made a contribution of ¥ 1,000