北师大版高中英语必修3unit8adventurelesson11内容摘要:
nses: realise, understand, know, believe, want, like, prefer, need, mean Simple and continuous tenses: arrive, watch, talk, feel, prepare Step 3 Learn the grammar 1. 英语中的动词可以分为两类:动作动词和状态动词。 动作动词描述动作,可用于一般时态和进行时态;状态动词描述状态,一般不用于 进行时态。 静态动词有以下四类: a, 表达思维活动的动词: admit, agree, believe, know, mean, prefer, realise, remember think, want b, 表达情感的动词: adore, care, like, dislike, hate, love, hope c, 表示拥有和存在的动词: appear, have, be, belong, need, seem, contain d, 感官动词: feel, hear, look, taste, smell, sound see 2. 但有些状态动词也可以表示动作。 Ask students to read these sentence and find their difference. 1. a. All our guides have several years of experience in leading hiking trips in the Himalayas. b. You are having a hot cup of tea. 2. a. You are feeling tired.。北师大版高中英语必修3unit8adventurelesson11
相关推荐
conference begins at 10 tomorrow according to the timetable. [我的发现 ] (1)句 ① 谓语动词由 will/shall+动词原形 构成,用来表示单纯的将来安排和打算;句 ②中 be going to 意为 “ 打算 ” ,说明主语的意图,即将要做某事;句 ③ 中 be going to 表示已有迹象表明将发生某事。 (2)句 ④
nst each other. 他总是对他的女儿们严格要求,训练她们彼此竞争。 Their products pete directly with ours. 他们的产品与我们的直接竞争。 He weled the chance to pete against professional athletes. 他很乐意有机会与职业运动员比赛。 The two teams, United
sonal. Arouse the Ss’ interest Step 2 Reading 1. Read the text quickly and match the pictures with the festivals 2. Try to say out some key words of each passage, if they can’ t, teacher will give
)The exams are likely to work out as expected and my dream to be admitted ________ my favorite university will e true. 考 试结果可能会正如所预料的那样,我被我 最喜爱的大学录取的梦想将会成为现实。 ② (2020 广东,阅读 B)Alice put it in the
【 At the Palace of the Doges Venice, you can see the white marble walls | and the 雕像 的 ]阳台。 【 [纽约的 ]克莱斯勒大楼是 [顶楼有 咖啡馆 的 ]最漂亮的摩天大楼 之一。 】【 在布达佩斯邮政储蓄银行大楼的 屋顶 ,有奇异的装饰物 象征波浪、鲜花和 天使。 】【 令人惊奇的 [苏格兰 Eilean
four soldiers stand for army of thousands.】 In a word, every action and movement [in Beijing Opera] is important. Lesson 3短文填空 , 做到看汉语用英语叙述 “尝试民乐 ”这一话题 , 并且默写。 【 孔祥东天生与音乐结缘。 五岁的孔往往在纸钢琴 键 上练习得如此之多,