北师大版英语八下unit11workingwithanimalsppt复习课件内容摘要:

• Did you meet any ______________ people on the plane? • (embarrassing, embarrassed) • I felt ________________ about how messy the house was. • She asked a lot of _________________ questions. • (boring, bored) • The job was so _________________. • After a while, I got _______________and left. • (三)课文词组 • 1. stay at a fivestar hotel • 2. swim in the Pacific Ocean • 3. feed animals • 4. hunt wild animals • 5. protect wild animals • 6. continue to do • 7. reduce the killing of • 8. allow people to kill • 9. in difficult conditions • 10. take photos of • 11. hurt my leg • 12. run all over the set • 13. train animals • [课堂练习] • 一、用所给单词的正确形式填空。 • 1. Playing football is an ( interest) game. Many people are (interest) in it. • 2. She was (please) at the (please) news. • 3. I found her。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。