北师大版英语一下unit8animalslesson教学设计2内容摘要:

ask, “ What color?” Elicit, red, brown, green and so on. ( 3) Point to different objects and ask, “ How many?” Elicit, one, two, and so on. ( 4) Say, “ Show me a circle.” Have children point to a circle. ( 5) Repeat the step above for square, triangle, star, and heart. Step 3: Read and color ( 1) Direct their attention to the instructions in the top lefthand cor。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。