人教版英语八下unit8haveyoureadtreasuresectiona-1课件内容摘要:
’s feet on the sand. Who else is on my island? How long have they been here? Not long after that, I saw some cannibals trying to kill two men from a broken ship. One of them died but the other ran towards my house. I helped him kill the cannibals. This man now lives with me and helps me. I named him Friday because that was the day I met him. He is smart and I have already taught him some English. Then answer the questions. does Robinson Crusoe wait for? 2. Why does Robinson Crusoe call the man Friday? He waits for another ship to take him back. Robinson Crusoe named him Friday because that it was Friday when they met. 1. You can use these to shoot things: _____ 2. Something you use to travel in the sea:____ 3. A piece of land in the middle of the sea: ______ 4. You can use these to cut things: _______ 5. Signs left behind by someone or something: ________ 3b. Read the passage again. Find words that have these meanings. gun ship island knife mark 1. Robinson Crusoe arrived on the island with enough food and drink. 2. Friday made a small boat. 3. Robinson had some food and tools when he first arrived on the island. 4. Robinson used the ship to build his house. 5. Friday saw some marks of another mans feet on the beach. 6. Robinson tried to kill the two men. 3c. Correct the sentences. 1. Robinson Crusoe arrived on the island with enough food and drink. 2. Friday made a small boat. 3c Correct the sentences. Robinson Crusoe arrived on the island without food and drink. Robinson Crusoe made a small boat. 3. Robinson had some food and tools when he first arrived on the island. 4. Robinson used the ship to build his house. Robinson had no food and。人教版英语八下unit8haveyoureadtreasuresectiona-1课件
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。