2012年12月六级听力真题及答案详解内容摘要:
2012年12月六级听力真题及答案详解 In At of or be be be a ), B), C) ), is a 部分试题请在答题卡2上作答。 11. A) a a A) He He is is at It is to be at It is to at A) is to to is s by A) A of a on a a A) B) s of A) Do on to Go at A) in in of A) a a in a 9 2 on A) ) in in ) A) of to He to A) to in 3 5 on is at is of D) He e is in e a e is of do t in to is a it is a of to is a ,000 ,000 is in t to of as At of 8,000 be in a of on A is to go If 0,000 at a or to to a to a Or if do to a of do so is if t go go t or of or of Id to go t a No on me to My of 案:a 解析】这是一道较为简单的推理题,前提是考生需知道 示“ 野餐用具,露营装备”,由此可知,括 女士能借给男士一个睡袋,此题的设置稍微绕了个小弯,为考生解题设置了一定难度。 go 野餐,去露营;袋。 I promise。2012年12月六级听力真题及答案详解
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。