现代大学英语听力3原文及答案内容摘要:
现代大学英语听力3原文及答案 11【答案】A. s s 1) to to to or or to on a 【原文】My an as a of go so I at Its to in is to So me a of it to be at of so 209 in 0 no in it is of to of of 284, in to to to or or to in to 440 I s at of 511 513, he he a to “go on a go 【答案】A. 1) a) 2) b) 3) a) 4) c)B. 1) to do a in 1) 文】me of if to us am It is a a in in to of is to in in by is a of of in to I my to in of a is a on in to It as of is as It is To no of is On at or of 00 of in of alki。现代大学英语听力3原文及答案
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。