冀教版英语八下unit6connectlesson43ppt课件内容摘要:

re large and tall. 河边的树又高又大。 • 2)关系代词,那个,那些 • He struck the poor dog, which had never done him ,那条狗从未伤害过他。 • 3)形容词,哪,哪一个 • Which foreign language are you studying? 你在学哪种外语。 • Before the printing press, somebody write every book by hand with a pen. 在印刷机之前,每本书是一些人用钢笔手工写的。 • by hand手工 • That old book was written by hand. 那本旧书是人工抄写的。 • I like to eat dumplings made by hand. 我喜欢吃手工包的水饺。 • 【 拓展 】 • by hand还有“用体力”“由专人”等意思。 • The letter was delivered by hand.。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。