北师大版英语高一下册module3unit7thesealesson4内容摘要:
Because his hair was white, not black. Complete the sentences below with these words from the text. afterwards, in the end, one day, suddenly, then, when (1) in 1964, Robet Le Serrec was sailing near the Australian coast (2) he decided to stop near an island. (3) , he saw a huge creature resting beside his boat. He took a photograph, and (4) the creature swam away. (5) ,he showed the photograph to scientists, but(6) ,nobody believed him. Step 4 Language points at that moment 在那一时刻 the moment 一 …… 就 I was deeply moved and tears run down my cheeks at that moment. The moment Tom went off the taxi he ran towards the hospital. at great speed 以非常快的速度移动 也可以写成: with great speed make sb. do 让某人做某事 The teacher made Xiao Hua help me. terrified 形容词,可怕的。 terror n. terrible/。北师大版英语高一下册module3unit7thesealesson4
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。