北师大版英语四上知识点总结内容摘要:

u have any caps? Yes, we do. 8. What size do you want? Medium. It’s cheap. C. 语法: 1. how much 的用法 2. Do 的用法总结 教导主任签字: 卓越优优教案提纲 教师:杨爱荣 科目:新 四 年级 英语 第 六 次 一、授课目的与考点分析: 1. 询问价格 2. wh 的发音 二、授课内容: A. 重点语音 what, where, when, whistle, wheat, whale, wheel B. 重点句子: 1. Do you have any sweaters? Yes, we do. 2. Do you have any jeans? No we don’t. 3. We don’t have any. 4. What size do you want? Small. / size 20. 5. The shoes are too expensive/ big/small. 6. Do you have any large socks? No, we don’t have any. 7. How much are they? They’re twentytree Yuan. 8. Look at the girls. C. 语法: 1. how much 的用法 2. wh 的发音 教导主任签字: 卓越优优教案提纲 教师:杨爱荣 科目:新 四 年级 英语 第 七 次 一、授课目的与考点分析: 1. 方位介词 2. 就地点提问 二、授课内容: A. 重点单词及短语 where, on, rock, under, in, behind, in front of, look for, sad, ground, nest to, bed, desk, sofa, chair, floor, farm, shark, there be, look for, on the ground B. 重点句子: 1. The bird is on the rock. 2. The snake is under the rock. 3. The frog is in the water. 4. The squirrel is behind the tree. 5. Mucky is in front of the tree. 6. What are you looking for? My nut. 7. Is it in the water? No, it isn’t. 8. It isn’t on the ground. No, it isn’t. C. 语法: 1. 方位介词( in, on, under, behind, in front of) 2. Where 的用法 Where is your house? It’s near the post office. 教导主任签字: 卓越优优教案提纲 教师:杨爱荣 科目:新 四 年级 英语 第 八 次 一、授课目的与考点分析: 1. 方位介词的用法 2. ar 的发音 二、授课内容: A. 重点语音 Shark, heart, farm, car, star, arm, park, large, yard, bar B. 重点句子: 1. Where is the book? It’s on。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。