2010届高考英语短文改错百篇练习4内容摘要:

2010届高考英语短文改错百篇练习4 英语:短文改错百篇练习四(60核人:of of s 6 If in 7 in be 8 in be 9 be as go 5 0 be a so be 1 00 to If 2 of be in be 3 be 4 It is 5 in 76. 84. do 6 it t it to If 7 it to 8 Im to do 9 a I to 0 it in an 81 I to to 2 to 3 me So I 4 5 my i dot 或者 77去掉 8去掉 9do80812834is He 休)is of my He 6. we in He 7. us He to 78. 9. to we in 80. he us to At I to 1. in me my 2. I 3. He is to 84. As an he is by 5. 77 78 790to 81掉 82 83 掉) 84在 加 8564I t a of at my I 6. 7. is to go 8. a my 9. of as a 0. as my 1. 2. in I t 3. my of 4. is as a a 77. 78. 79. 加 80. 加 81 82. 去掉 83. 为 84. to on I to 6 is a 7 If a it to 8 as a So its to 9 to a he 0 t 81 of a is If 2 as 3 to do to 4 to do 85 76 77879081 82 a 84 85 no 6 a is if。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。