北师大版五年级上册英语unit3schoolsportsday(lesson5-6)内容摘要:

n check the answer in pairs. S: Correct the answer. Step5: Listen and write the words. T: Explain to the children that they are going to listen to the story from the chicken’s point of view. S: Look at the pictures. T: Play the tape and have the children listen carefully . S: Listen to the tape carefully. T: Play the tape again and have the children write the missing words. S: Listen to the tape and try to do it. T: Have the children read the story and check the answer. S: Read the story and correct the answer. Homework: Tell the story to their parents. 课后反思:部分学生对过去是掌 握的不好,应加强练习。 The 6th period Teaching Aims: 1. The students can sing the song. 2. The students like to learn English. 3. The stud。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。