宾语从句习题及答案内容摘要:

hether D. where (17) Could you tell me __ the radio without any help? A. how did he mend B. what did he mend C. how he mended D. what he mended (18) I want to know __ . A. whom is she looking after B. whom she is looking C. whom is she looking D. whom she is looking after (19) Do you know where __ now? A. he lives B. does he live C. he lived D. did he live (20) Do you know what time __ ? A. the train leave B. does the train leave C. will the train leave D. the train leaves 答案: , when, where, who, why 2. 去掉 that; if 改成 whether;改成 she is; will改成 would;去掉 that 单元练习题 1. Fill in the blanks with the proper words. crazy, pain, recall, consider, cause (1) Can you ___ being a child? (2) He’s ___ to drive his car so fast. (3) Do you suffer much ___ ? (4) The heavy rain can ___ a flood. (5) We must ___ the feelings of other people. 2. Match colum A with colum B . A: (1) What’s the weather like today? (2) I have a headache and a sore throat. (3) What39。 s the matter with you? (4) Do you have a cough? (5) I had a sore throat, Mom. B: A. Take some medicine, Mike. B. I have a stomacha。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。