外研版八上modules1~6ppt期中综合检测内容摘要:

arriage of Figaro. 【 解析 】 选 D。 根据文章倒数第二段最后一句可知 The Marriage of Figaro不是由贝多芬创作的。 5. Why did people love his music? A. Because he was unhappy. B. Because he was happy. C. Because his music always encouraged people to struggle against the fate. D. Because he was very great. 【 解析 】 选 C。 根据文章最后一段第二句话可知人们喜欢贝多芬音乐的原因是他的音乐鼓励人们与命运抗争。 (B) One day, a poor boy, who was trying to sell goods door to door, found that he had only one dime (十分硬币 )left. He was very hungry so he decided to beg for a meal at the next house. However, he lost his nerve when a lovely young woman opened the door. Instead of a meal he asked for a drink of water. She thought he looked hungry so she brought him a large glass of milk. He drank it slowly, and then asked, “How much do I pay for you? ” “You don’t owe me anything, ”she replied. “Mother has taught me to help people in trouble. ”He said, “Then I thank you from the bottom of my heart. ” Years later the young woman became ill. The local doctors finally sent her to the big city, where specialists could be called in to study her rare disease. When he heard the name of the town she came from, a strange light filled his eyes. Dressed in his doctor’s gown he went in to see her. He recognized her at once. He determined to do his best to save her life. At last the woman was saved. When the bill was sent to her room, she was afraid to open it because she was sure that it would take the rest of her life to pay it off. Finally she looked, and the note on the side of the bill caught her attention. She read these words: “Paid in full with a glass of milk. ” 6. What was the poor boy doing one day。 A. He was travelling. B. He was selling goods. C. He was playing in the street. D. He was going to a shop. 【 解析 】 选 B。 根据文章第一句可知 , 这个男孩正在卖东西。 7. What did the poor boy do when he saw the young woman? A. He asked for a drink of water. B. He asked for some food. C. He asked for a glass of milk. D. He asked for some bread. 【 解析 】 选 A。 根据第二段第二句话可知。 8. Who taught the woman to help people in trouble? A. Her grandma. B. Her grandpa. C. Her father. D. Her mother. 【 解析 】 选 D。 文中说了妈妈告诉她要帮助有困难的人。 9. Why was the woman sent to the big city hospital? A. Because the doctors in the big city could help her. B. Because she wanted to go there. C. Because she lived in the big city. D. Because she knew the man was there. 【 解析 】 选 A。 文中说大城市的专家能够研究她的这种罕见的疾病 , 所以说大城市的医生能够帮她。 10. Why was the woman afraid to see the bill? A. Because she didn’t want to pay the bill. B. Because she didn’t have enough money. C. Because she had a lot of money. D. Because she wanted the doctor to pay the bill off. 【 解析 】 选 B。 最后一段第一句说她不得不用她剩余的时间来还清所有的医药费 , 所以说她没有足够的钱。 (C) Weledeh Catholic School Transportation Survey Joanne McGrath worked with one hundred students in Grade 1. Here are questions and results: 1. How do you usually e to school in the morning? Taxi: 2 Car: 50 Bus: 30 Bicycle: 5 Walking: 13 2. How do you usually go home after school? Taxi: 2 Car: 38 Bus: 39 Bicycle: 5 Walking: 16 3. If you go to school in a car, how many people are there in it? 2 passengers: 17 3 passengers: 20 4 passengers: 11 5 passengers: 2 4. Do you walk, ride your bike, or skateboard to school when the weather is warm? We found that colle。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。