2000-2010英语专八真题改错内容摘要:
2000-2010英语专八真题改错 2010年专八真题改错原文So as we as of to be as as to to It or be to or is of in or or of or is of a we is of is to a a of is in be as in of if in we no to be as on of or if of in is a of a of to a we of us a a a a a a a a a a a a a 2010年专八真题改错参考答案1 2 为 3 t; 4 为 7 8 9 as 10 a to 1)_In a is on 2)_of or (3)_a be to 4)_a be on 5)_it is in it of 6)_or it is in to be If a be to a 7)_it it it a of or 8)_is it 9)_so to it to 10)_英语专八改错参考答案(1)接 2) 为 a 为是不确指;(3)为 于上文匹配;(4)为 者少指时间之长短;(5)然应为 6) in 掉 7) 为 8) it 为 it 9) 为 10) to 掉 为 7 年英语专业八级考试改错参考答案it be no is no in in (1) of us in a (2) It is of (3) in of (4) is no no of a a of (5) we It is (6) in is of in to or (7) on to on (8) We of or of to (9) a of of to be ar。2000-2010英语专八真题改错
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。