人教版高中英语必修一unit3traveljournal第4课时内容摘要:
. A. had left B. leaves C. left D. was leaving 4. Robert _________ me his address the other day, but I’ m afraid I _______it. A. had given。 lost B. has given。 have lost C. gave。 have lost D. gives。 have lost 5. You ‘ ve made her so angry. But I ____________ to. A. don’ t mean B. didn’ t mean C. haven’ t meant D. wouldn’ t mean 6. He is driving __________ a speed of 100 km per hour. A. in B. with C. at D. for 7. The train ___________ at the present speed until it reaches the foot of the mountain at about nine o’ clock tonight. A. went B. is going C. goes。人教版高中英语必修一unit3traveljournal第4课时
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。