牛津版上海版八年级下册unit7poemslistening课件内容摘要:

poem. To correct mistakes when you listen to a poem, you should:  read through the poem in the text and check whether the words of the poem make sense.  read the poem again and pay attention to the word at the end of each verse. Make sure that it rhymes with the word at the end of the second line in the verse.  listen to each line carefully and pick out any wrong words. Benny has written a poem about。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。