20xx春牛津译林版英语七下unit7abilitiesreadingii内容摘要:
2 What’s the opposites of it? Step4 Drills(matches) After the students are familiar with the adjs, let them do it. Step5 Text (Fill in the blanks) 1 Show students the text and give them the clear requests 2 Check their answers. (let two students write answers on the blackboard) 3 Praise and encourage students Step6 Widen the eyes He。20xx春牛津译林版英语七下unit7abilitiesreadingii
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。