人教版高中英语选修9unit3australiaword单词词汇汇总内容摘要:

desperately (adv)绝望地 desperateness/desperation (n)绝望 , 缩短 shrink back 退缩 , 畏缩 shrink from回避 shrink into oneself缩作一团 ; 变得沉默寡言 shrink up( 因害羞 ) 畏畏缩 缩 shrinkable (adj)会收缩的 shrinkage (n)收缩 , 缩水 „ into说服。 做 talk/persuade sb into doing sth说服某人做某 事 talk /persuade sb out of (doing ) sth说服某人放弃做某事 ; 缠 ; 弯曲 wind down完全松开 , 放松一下 wind off 解开 , 松开 wind up 卷紧 , 上紧。 的发条 痊愈;复原 recover from经历。 以后恢复原状 recover oneself 恢复正常状态 recovery(n)复原;恢复 ;无意识的 be unconscious of 未察觉到;未意识到 unconsciously (adv)无意地;不知不觉地 unconsciousness (n)昏迷 Reading 1 1. mon (adj) 共同的,普遍的,常见的 【相关链接】 mon knowledge/sense 常识 mon people 老百姓 have sth in mon with sb 与某人有共同之处 have nothing in mon with sb与某人没有共同之处 反义词: unmon (adj) 2. include (vt) 包括,包含 【相关链接】 n/pron. +included including + n/pron included (adj) : eg. Everyone laughed , me included.(每个人都笑了,包括我 ) including (prep.) :eg. Everyone laughed, including me. 3. sb be famous for 某人因某种知识技能而出名 sb be famous as 某人以某种职业身份而出名 was famous for his Theory of。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。