20xx牛津上海版一起六下unit11controllingfireppt课件3内容摘要:

It’s in the corridor. Where is it? It’s inside the room. Look There is … on the ground floor . first are second third Look and write the first floor shoes on the second floor coffee shop on the ground floor There are toys on the third floor. Kitty is telling Peter the location of the firefighting equipment in their school. Listen and help Peter mark them on the floor plan. Listen and draw Listening      216。 216。 Reading Read and tick () Many, many years ago, people used a stick, a large piece of wood and dry leaves to。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。