unit12lifeisfulloftheunexpected第2课时教案内容摘要:

themselves for about two times, and then asks one student to read to the class. Then the teacher reads the text and changes it to Chinese. Then Let the students read again and let them pay attention to the structure “ past perfect sense” .And ask one student to answer the questions. • 1. Which two events does the writer mention? • A. The planes hit his office building. • B. He missed his plane. • 2. How did the writer end up missing both events? • Lucky. Now the teacher asks two students to read the passage to the class, after one finish reading , the teacher says Good to him or her。 them the teacher read the text and。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。