牛津译林版英语九下unit4greatpeoplereadingppt课件内容摘要:

He received his student pilot’s licence. He successfully brought the spacecraft down into the western Pacific Ocean. Apollo 11 was the first spacecraft to land on the moon. 4 What did Armstrong and Aldrin do on the moon? 5 What do people think the aliens tried to do? 6 What was the highest award that Neil Armstrong received? They walked on the moon and collected rock samples. They think the aliens tried to warn Armstrong and Aldrin to stay away. The Medal of Freedom was the highest award Neil Armstrong received. Read the text again and finish the table Time Major events In 1930 In 1946 In 1949 In 1962 In 1966 In 1969 He was born in Ohio. He received his pilot’s licence. He joined the navy. He was selected to be an astronaut. He went into space in Gemini 8. He walked on the moon. Read the passage together and fill in the blanks with right words Neil Armstrong is the first man to walk on the moon. He took his first _______ at six and received his pilot’s ________ at 16. In 1949, Neil _______ the navy and worked as a _______. He was _______ to。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。