20xx牛津上海版一起六下unit11controllingfireppt课件1内容摘要:
• Some students may shout loudly and cry. must remember to turn off the fans in our classroom. must not use the lifts instead of the stairs. We must not shoutly or cry.• Some students may stand outside the classroom and watch the fire burning. We must not stand outside the classroom and watch the fire burning.C CONTENTS What must/mustn’t we do in a school fire ? • Some students may push other students. • Some students may jump off from the windows. • Some students may run down the stairs. • Some students may fet to follow their teachers. We mustn’t push other students. We mustn’t jump off from the windows. We mustn’t run down the stairs. W。20xx牛津上海版一起六下unit11controllingfireppt课件1
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。